Requirements to Onboard Access Points or Switches

To ensure the successful onboarding of the managed equipment in the controller, the administrator should verify the following aspects:

  • Sufficient AP Capacity Licenses or Switch Capacity licenses: Confirm that there are enough licenses in the controller to accept the required equipment.

  • System Capacity of the Controller: Ensure the current amount of onboarded APs and Switches does not exceed the capacity of the controller.

  • Supported Model: Verify that the AP model or Switch model is supported in the current version of the controller.

  • Country Code Matching: Ensure that the hard-coded country code in the AP matches the country code configured in the controller.

  • AP MAC OUI Validation: Check if the AP MAC address adheres to the validation rules. OUI Validation rules check the first three octets of the AP MAC address.

  • AP/Switch Registration Rules: Confirm that the AP or Switch can be accepted or make sure it is manually approved.

  • AP Certificate Validity: Verify that the AP certificate is valid or that certificate validation is disabled in the controller.

  • TPM switch type is allowed: Ensure the controller is configured to accept switches with self-signed certificates.

  • Network Connectivity: Ensure that the AP and Switch are reachable by the controller and that the required ports for communication are open in the firewall.

During the normal onboarding process, it is expected for the APs to reboot at least twice when doing the firmware update and the configuration sync. Using the LED indicators on the AP helps to understand the current stage of the AP onboarding process.

Note: Refer to the RUCKUS SmartZone Network Administration Guide for a full understanding of the above items and additional information related to onboarding APs and Switches to the controller.