Powering Cluster Back
SmartZone cluster nodes may need to be shut down for physical migration/maintenance
purpose.
- Power up all nodes at the same time period.
- All nodes are connected by network.
- During the setup, iIt is strongly recommended to configure static IP address to SmartZone interface, if the node's interface IP address settings is configured to DHCP. Make sure the DHCP server assigns a fixed IP address to the interfaces.