Powering Cluster Back

SmartZone cluster nodes may need to be shut down for physical migration/maintenance purpose.
To avoid SmartZone enter crash mode, the cluster needs to form back in time (within Two-and-Half hours). To power up the nodes, perform the following:
  1. Power up all nodes at the same time period.
  2. All nodes are connected by network.
  3. During the setup, iIt is strongly recommended to configure static IP address to SmartZone interface, if the node's interface IP address settings is configured to DHCP. Make sure the DHCP server assigns a fixed IP address to the interfaces.