Migrating a Ring Stack to a Campus Fabric Domain

Migrating from a Ring Stack to Campus Fabric

From Top

Use Case 1: Converting an existing ring stack to PEs in a linear topology

Use Case 2: Converting an existing ring stack to PEs in a ring topology

Procedure Summary

  1. Connect the CB and the existing stack.
  2. An existing ring stack can be connected to bring up either a PE chain or a ring.
  3. On the stack active controller, erase the startup configuration and reload.
  4. Run the SPX interactive-setup utility.
  5. When prompted, select a link to be removed to form a valid topology. When converting a ring stack, you can remove either of the pre-existing stacking links. Based on your selection, a valid topology is displayed for confirmation.
  6. You are prompted to accept or change default PE ID assignments.
  7. Discovered units reload, and the former stack units join the Campus Fabric domain as PEs.
  8. Once the topology is active, verify the CSP operational state with the show spx csp all command, and confirm that the handshake is complete. If there is a ring in the topology, verify the ring operational state using the show spx ring all command.