Deployment Scenarios
In this section:
- Deployment Scenario 1: Bringing Up a Complete Campus Fabric Domain with Zero-Touch
- Deployment Scenario 2: Adding Units to a Ring or Linear Topology Using the SPX Interactive-Setup Utility
- Deployment Scenario 3: Migrating an Existing Stack to Campus Fabric
- Deployment Scenario 4: Replacing a PE
- Deployment Scenario 5: Preventing an ICX 7250 or ICX 7450 from Being Discovered by Zero-Touch
- Deployment Scenario 6: Changing PE IDs Using SPX Interactive-Setup
- Deployment Scenario 7: SPX PE Movement: Moving PEs Without Changing IDs
- Deployment Scenario 8: Adding a New Link Between CB-PE or PE-PE to Change Existing
Linear Toplogy to Ring TopologyYou can discover new physical links between a CB and an edge PE or between two edge PEs and form a PE ring from PE chains. This is applicable to FastIron 08.0.70 and later.
Parent topic: Zero-Touch Provisioning