Best Practices
zero-touch-enable command under spx cb-configureIs spx cbconfigure a command? Is this a mistake? Vandhana "spx cb-configure" is a executable configuration mode
zero-touch-enable configuration once PE units have been discovered.A new unit has no startup configuration flash during bootup. (The user has never issued the
write memorycommand.)You can enter the
erase startup-configandreloadcommands to make it a new unit.ICX7450-48 Router# erase startup-config Erase startup-config Done.dhcp server lease database is also removed stacking/spx pe flash file is also removed ICX7450-48 Router# reloadAre you sure? (enter 'y' or 'n'): y
Remove the
spx allow-pe-movementconfiguration after the PEs are moved.Remove the
spx allow-pe-movementconfiguration using theno spx allow-pe-movementcommand in global configuration mode once the PEs have been moved and the Campus Fabric topology is stable.SPX(config)# spx allow-pe-movement Please remove the spx allow-pe-movement configuration after the PEs are moved
Before changing PE IDs, make sure that you know what reconfiguration will be required related to the changed IDs.
Do not attempt to change PE IDs when
spx allow-pe-movementis configured.Ruckus recommends changing PE IDs, if necessary, during the initial bring-up of Campus Fabric, before connecting hosts or configuring any protocols.
If ports are planned for dedicated use in a Campus Fabric domain, configure the ports as SPX LAGs or SPX ports rather than as zero-touch ports. The zero-touch utility splits them into separate SPX LAGs as needed during the discovery process, using its Auto-LAG capability. This approach helps avoid looping of packets, which can cause high CPU utilization. Refer to Zero-Touch Deployment Considerations for more information.
With zero-touch, PE ID assignments are automatically based on the pool of available IDs. If you want to use specific IDs, use the SPX interactive-setup utility.
When adding new PE units to existing PE units, use the SPX interactive-setup utility instead of zero-touch. When adding new units to an existing PE linear chain to form an SPX ring, use manual setup instead of zero-touch in releases prior to FastIron 08.0.70.
From FastIron 08.0.70 and later, SPX interactive-setup can discover new links between PE and PE or CB and PE when a user tries to make an SPX PE ring topology on an existing linear topology by adding new links. Refer to Deployment Scenario 8: Adding a New Link Between CB-PE or PE-PE to Change Existing Linear Toplogy to Ring Topology.
Wait at least 30 seconds before running the SPX interactive-setup utility again.
SPX# spx interactive-setupInteractive-setup ends 15 seconds ago, please retry in 15 sec
This section got accidentally removed while editing the document. CI then copy pasted from pdf version. But I could not get the alignment. So please be sure to refer the old Campus fabric and align the same way