RUCKUS ICX Switch Port Extender Deployment Guide
- 1 Copyright Statement
- 3 Preface
- 3.1 Overview
- 3.2 Purpose of This Document
- 3.3 Audience
- 3.4 Objectives
- 3.5 Document History
- 4 SPX Technical Architecture
- 4.1 Control Bridge
- 4.2 Port Extenders
- 5 Supported SPX Topologies
- 6 Unsupported SPX Topologies
- 7 Scaling (Supported Topologies)
- 8 SPX Construction Methods
- 8.1 Prerequisites
- 8.2 Valid Port Combinations
- 9 Bill of Materials
- 10 Deployment Considerations
- 11 Bringing Up SPX
- 11.1 Configuration Notes
- 11.2 Reference Topology
- 11.3 Configuring the CB
- 11.4 Configuring the PE
- 12 SPX PE Ring
- 13 Deployment Scenarios
- 13.1 Reference Topology
- 13.2 Deployment Scenario 1: Deploying a PE Ring in an Existing Campus Fabric Domain
- 13.3 Deployment Scenario 2: Deploying a PE Ring Using ZTP
- 13.4 Deployment Scenario 3: Adding a New PE Unit to an Existing PE Ring
- 13.5 Deployment Scenario 4: Replacing a PE in an Existing PE Ring
- 13.6 Deployment Scenario 5: Moving SPX Links Between Modules in a PE Ring
- 13.7 Deployment Scenario 6: Adding More Links to a Live SPX Link Using the multi-spx-lag Command
- 13.8 Deployment Scenario 7: Removing Links from a Live SPX LAG and Converting the LAG to an SPX Port
- 13.9 Deployment Scenario 8: Changing a PE Ring to a Linear PE Chain
- 14 Image Upgrade
- 15 Debugging and Verification Commands
- 16 PE Ring FSM States
- 17 Running Configuration
- 18 Best Practices
- 19 Zero-Touch Provisioning
- 19.1 ZTP Overview
- 19.2 Zero-Touch Deployment Requirements
- 19.3 PE Candidate Requirements
- 19.4 Topology Requirements
- 19.5 Supported Topologies for Zero-Touch
- 19.6 Unsupported Topologies for Zero-Touch
- 19.7 Zero-Touch Features
- 19.8 SPX Interactive-Setup
- 19.9 Managing PEs
- 19.10 Zero-Touch Deployment Considerations
- 19.11 Deployment Scenarios
- 19.11.1 Deployment Scenario 1: Bringing Up a Complete Campus Fabric Domain with Zero-Touch
- 19.11.2 Deployment Scenario 2: Adding Units to a Ring or Linear Topology Using the SPX Interactive-Setup Utility
- 19.11.3 Deployment Scenario 3: Migrating an Existing Stack to Campus Fabric
- 19.11.3.1 Migrating a Linear Stack to the Campus Fabric Domain
- 19.11.3.2 Migrating a Ring Stack to a Campus Fabric Domain
- 19.11.3.2.1 Migrating a Three-Unit Ring Stack
- 19.11.3.2.2 Migrating a Two-Unit Ring Stack
- 19.11.4 Deployment Scenario 4: Replacing a PE
- 19.11.5 Deployment Scenario 5: Preventing an ICX 7250 or ICX 7450 from Being Discovered by Zero-Touch
- 19.11.6 Deployment Scenario 6: Changing PE IDs Using SPX Interactive-Setup
- 19.11.7 Deployment Scenario 7: SPX PE Movement: Moving PEs Without Changing IDs
- 19.11.8 Deployment Scenario 8: Adding a New Link Between CB-PE or PE-PE to Change Existing Linear Toplogy to Ring Topology
- 19.12 Deployment Recommendations for ZTP
- 19.13 Best Practices
- 19.14 Debugging Notes