Summary of installation tasks
Follow the steps in the following table to install your device. Details for each of these steps are provided on the pages indicated.
Installation tasks
|
Task number |
Task |
Where to find more information |
|---|---|---|
|
1 |
Ensure that the physical environment that will host the device has the proper cabling and ventilation. |
Preparing the installation site section |
|
2 |
Unpack the device and all included accessories. |
|
|
3 |
Install the device on a desktop, or in an equipment rack. |
Installing the device section |
|
4 |
Once the device is installed, plug the device into a nearby power source that adheres to the regulatory requirements outlined in this manual. |
Powering on the system section |
|
5 |
Verify that the device is working properly by plugging it into a power source and verifying that it passes the self test. |
Verifying proper operation section |