Pre-ISSU Compatibility Checks for an SPX System

After you enter the issu command but before an ISSU is performed in an SPX system, a set of checks similar to the set of compatibility checks performed for a stack is executed to determine whether the SPX system is ready for an upgrade.

.

Note: In contrast to the standard stacking checklist, zero-touch provisioning (ZTP) cannot be in progress when an SPX ISSU is initiated.
A successful compatibility check for an SPX system displays the passing results shown in the following table. Any differences between an SPX system and a stacking system are noted.

Pre-ISSU Checks for an SPX System

Check Passing Result
Stacking Topology is Ring Yes
Standby Present Yes
Standby ready for upgrade Yes
Flash use in progress No
Stack interactive-setup in progress No
Stack ZTP is configured No
SPX interactive-setup in progress No (unique to SPX ISSU)
ZTP is configured No (unique to SPX ISSU)
ISSU in progress or aborted No
Election pending No
Election in progress No
Reload pending No
CPU utilization high No
All units in ready state Yes
Primary Image is upgrade compatible Yes
Secondary Image is upgrade compatible Yes
Startup config and Running Config Same Yes
Boot option present in running config No
User in Config mode No
POE-Firmware Download is in Progress No
System ready for issu If this flag is present, you can proceed with ISSU. Otherwise, check the conditions flagged by three asterisks (***) and make prescribed corrections to the device before performing an ISSU.
ISSU not in progress