Virtual Cable Test Considerations
When planning to use Virtual Cable Test (VCT), the following considerations and limitations should be taken into account:
- Avoid using VCT commands in a live network environment. Running VCT commands may cause ports to go up or down and can negatively impact network performance.
- The port where the cable is connected must be
enabled when you issue the
phy cable-diagnostics tdrcommand to diagnose the cable. If the port is disabled, the command is rejected. - VCT requires the Ethernet port speed be configured
to the default auto-negotiation speed prior to running the test. VCT does not
work
on ports with fixed speeds. Run the CLI command
speed-duplex autoon the target port to ensure proper port speed for the test. - Cable length measurement may vary due to different physical layers (PHYs) used across ICX products. The VCT feature should not be used for accurately measuring the length of the cable.
- If the remote pair is set to forced 100 Mbps,
any change in Media-Dependent Interface (MDI/Media-Dependent Interface Crossover
(MDIX) may cause the device to interpret the Multi-Level Transmit (MLT-3) line
code
as a reflected pulse. In this case, the device will report a faulty condition.
Note: In this scenario, it is recommended to run the TDR test a few times, clearing the registers before each test.
- Cat 3 or 4 cables with two or three pairs may fail in one or two of the pairs.
- It is not recommended to run VCT commands when adjacent ports are active.
- Fiber ports and 1G transmit media are not supported.
- Link DOWN ports are not used.
- VCT configurations do not apply to the management port.
- Proper cable standards should be followed to avoid impedance mismatches. Otherwise, signal reflections and performance issues can occur.
- Trunk lines and system-wide configurations are not supported.