Control Bridge Considerations
Keep the following considerations in mind when configuring Campus Fabric:
- To be used in a Campus Fabric configuration, an ICX 7650, ICX 7750, or ICX 7850 device must be running a router image.
- An ICX 7650, ICX 7750, or ICX 7850 stack or a standalone ICX 7650, ICX 7750, or ICX 7850 device can be enabled as a CB.
- A traditional stack that serves as a CB stack in a Campus Fabric domain can contain no more than 4 units.
- A stack that serves as the CB can be configured in the same way as any traditional stack. A separate SPX interactive-setup utility is available for configuring an SPX domain when zero-touch provisioning is not appropriate.
- ICX 7650 devices support SPX ports only on Module 1 or Module 2.
- To be operational, a Campus Fabric configuration requires correct CB-PE SPX port or SPX LAG configuration.
- If Spanning Tree Protocol (STP) is enabled on a CB, the CB must be reloaded for previous spanning tree configuration to be available.
For more information on maximum CB connections, refer to Campus Fabric scalability.