Reloading a Stack Unit
Use the
reload command to reload one or more stack units, for example, when necessary to repair
a malfunctioning unit. Stack units can be reloaded only if they are not the active
controller.
When the
reload command is entered on the active controller without the
unit-id parameter as shown in the following example, the entire stack reloads.
device# reload
stack switch-over command. When switchover occurs, the original active controller can be reloaded using
the
reload unit-id command.
You can specify a list of stack members to reload as shown in the following example.
device# reload unit-id 1,2,4-8
The example reloads units 1 and 2 and units 4 through 8.
For additional information on the reload command, refer to the RUCKUS FastIron Command Reference.